Quick Links

Procedures | Air Purge Test | Procedure

Procedure Requirements:

Engine State

Running

Operating State

Implement stationary

Hydraulic pressure < 18 615 KPa (186 bar) (2700 psi)

Hydraulic fluid > 49°C (120°F)

NOTE: To obtain low hydraulic pressure, turn off all SCVs and hydraulic functions.

Procedure Overview:

  1. Select to Begin Procedure.

Begin Procedure

  1. Follow messages on-screen to complete procedure.

  • Select anytime to Cancel and return to Air Purge Test Procedure Details page.

Cancel

  1. Confirm procedure by selecting OK to exit.

OK

If Calibration Fails:

  1. Select Retry button.

Retry

  1. Verify that all requirements listed on-screen have been met.

  2. If calibration fails twice, see your John Deere dealer or qualified service provider.