Work Point allows the implement controller to know the position of the seed delivery and adjust the response of the seed meters as you move through the field.
Work Point
Section Control disengages the seed meters based on the work point. On implements with two ranks or staggered row units, you can set the work point to the front rank, the rear rank, or between the ranks.
NOTE: If you set the work point to the front or rear rows on two-rank implements, change the dimension when you switch between wide and narrow row spacing.
Lower the implement while unfolded and in the planting orientation.
IMPORTANT: Measure along the center line of the implement, not at an angle.
Measure the distance from the drawbar pin or three-point connection to the point where seed is dropped.
|
OK Cancel |