Measure work point from connection point to the seed drop point or to application point of the most important product.
Measure while machine and implement are in a straight-line, operating position.
Implement dimensions may shift during operation. For best accuracy, measure dimensions with the implement engaged in the ground.
Hold the tape measure straight in vertical or horizontal directions.